Before drilling starts, the first phase consists in selecting and preparing a site to install the drilling rig and auxiliary services. Although the drilling rig itself only requires a level surface of some 60 m x 25 m, the need for adequate setback space between the well, the flare stack and the surrounding structures, including offices, lodging and laboratories, means that drilling companies must generally prepare an area of 100 m x 100 m. As well as maintaining safe distances between the different elements, an area this size allows for safe on-site handling and storage of the various equipment required for drilling operations.
The ground surface must also be prepared to make sure the ground will support not only the weight of the drilling rig, but also the weight of drill pipes or casings which can reach 180 tons.
Close